The scope of the project was to develop a system that integrates 2 interfaces for an existing profession or life situation. Keystone Practice Platform is designed to be connected across platforms for mobile and tablet. The mobile was designed with the piano instructor in mind since that mode of technology was the easiest to get internet access outside of the home. After surveying parents, the majority agreed that a tablet design would best fit the needs of the student.
The logo was created in Illustrator and the screens were constructed in Adobe XD.